THE Smoke Control Case Studies

Browse this portfolio for a smoke ventilation project like yours, from high-rise refurbishments to new-build developments across the UK.

877+ Projects
1,416+ AOV Windows
3,237+ Dampers
6,035+ O Range Panels
6,914+ Firefighter Switches
1,621+ AOV Roofvents
Filter
01 / 12
Residential Refurbishment, Manchester
Refurbishment Natural

Residential Refurbishment

Manchester

Smoke ventilation to the firefighting and refuse lobbies. Designed to BS EN 12101 and BS 9991, with cause-and-effect schedules agreed with the responsible person. Vent Trade supplied the products from UK stock; our SDI 19 certified team installed and commissioned.

15 Zones
2 Shafts
19 Panels
10 Dampers
View Smoke Ventilation Products
02 / 12
Residential Refurbishment, Brighton
Refurbishment Multi-system

Residential Refurbishment

Brighton

Smoke ventilation to the stair lobbies over 6 levels. Full system designed against the project fire strategy and BS EN 12101 with documented cause-and-effect logic. Products supplied from Vent Trade UK stock with our SDI 19 certified installation and commissioning.

12 Zones
1 Shafts
19 Panels
4 Dampers
View Smoke Ventilation Products
03 / 12
Commercial Refurbishment, London
Refurbishment Multi-system

Commercial Refurbishment

London

Smoke control to the lobbies linked to firefighting stair core. Compliant with BS EN 12101 and BS 9991, with the smoke ventilation strategy aligned to the building's escape route plan. Vent Trade delivered the equipment from UK stock with commissioning and golden-thread documentation by our team.

9 Zones
9 Panels
Equipment Specified
9x Control Panels11x Firefighter Switches1x Car Park Fan Set3x Induction Fans
View Smoke Ventilation Products
04 / 12
Commercial Refurbishment, Wigan
Refurbishment Natural

Commercial Refurbishment

Wigan

Smoke ventilation to the stair cores and firefighting lobbies. Specified to BS EN 12101-2 with control logic written against the building's fire strategy and BS 9991. Equipment supplied next-day from Vent Trade, with full functional commissioning carried out on completion.

10 Zones
2 Shafts
13 Panels
10 Dampers
View Smoke Ventilation Products
05 / 12
Residential New Install, Manchester
New Install Mechanical

Residential New Install

Manchester

Smoke extract and day-to-day to a lift lobby in a single stair block with 12 stories. Designed to BS EN 12101 and BS 9991, with cause-and-effect schedules agreed with the responsible person. Equipment supplied next-day from Vent Trade, with full functional commissioning carried out on completion.

13 Zones
1 Shafts
6 Panels
12 Dampers
View Smoke Ventilation Products
06 / 12
Residential New Install, Gloucester
New Install Multi-system

Residential New Install

Gloucester

Smoke extract to four stair cores and ventilated lobbies in a new university building in Gloucester. Full system designed against the project fire strategy and BS EN 12101 with documented cause-and-effect logic. Trade supply by Vent Trade with site install and SDI 19 commissioning sign-off by our team.

20 Zones
2 Shafts
20 Panels
12 Dampers
View Smoke Ventilation Products
07 / 12
Education New Install, Manchester
New Install Natural

Education New Install

Manchester

Smoke control to three new stair lobbies, each serving levels ground to forth. Engineered to BS 9991 with EN 12101-certified vents, dampers and panels working from a single addressable cause-and-effect. Supplied, installed and SDI 19 commissioned in-house: no sub-contracting at any stage of the works.

15 Zones
3 Shafts
18 Panels
12 Dampers
View Smoke Ventilation Products
08 / 12
Medical New Install, Catterick
New Install Natural

Medical New Install

Catterick

Smoke control to the lobbies to three firefighting stair cores, each severing four levels. Designed to BS EN 12101 and BS 9991, with cause-and-effect schedules agreed with the responsible person. Vent Trade supplied the products from UK stock; our SDI 19 certified team installed and commissioned.

12 Zones
1 Shafts
16 Panels
4 Dampers
View Smoke Ventilation Products
10 / 12
Residential Other, York
Other Natural

Residential Other

York

Smoke and daily use ventilation through 4 stair cores over 4 levels. Designed to BS EN 12101 and BS 9991, with cause-and-effect schedules agreed with the responsible person. Vent Trade supplied the products from UK stock; our SDI 19 certified team installed and commissioned.

16 Zones
5 Shafts
22 Panels
15 Dampers
View Smoke Ventilation Products
12 / 12
Residential Other, Oxford
Other Natural

Residential Other

Oxford

Smoke ventilation to the lift lobbies over 4 stair cores. Compliant with BS EN 12101 and BS 9991, with the smoke ventilation strategy aligned to the building's escape route plan. Vent Trade delivered the equipment from UK stock with commissioning and golden-thread documentation by our team.

4 Zones
4 Shafts
29 Panels
16 Dampers
View Smoke Ventilation Products

Start Your Project

Whether refurbishment or new build, our team delivers compliant smoke ventilation systems on time and on budget.