BS EN 12101-10: Smoke and heat control systems. Power supplies

BS EN 12101-10 specifies emergency power supply requirements for smoke control systems. Learn what compliance requires for UK specifiers and M&E contractors.

BS EN 12101-10 specifies the electrical power supply requirements for smoke control systems, including emergency power provision to ensure that smoke control functions remain operational during a mains power failure.

Part of the BS EN 12101 standard family.


Why Emergency Power Matters

A smoke control system is worthless if it loses power at the moment a fire breaks out. BS EN 12101-10 mandates that every critical smoke control function - opening of AOVs, starting of extract fans, closing of smoke dampers - must be backed by a reliable emergency power supply capable of operating for the full evacuation period.


Key Requirements

Mains Power

The primary power supply to the smoke control panel must be derived from a reliable, stable source. Voltage fluctuations and transients that might trigger nuisance alarms or false operation must be controlled through suitable stabilisation and filtering.

Emergency Power

When mains power is lost, the system must switch automatically to an emergency source. The standard requires:

  • Sufficient Capacity - The battery or alternative supply must power all critical smoke control functions for a defined period - typically 60 minutes - to allow occupant evacuation and fire service arrival
  • Automatic Switchover - Changeover from mains to emergency power must occur automatically and without delay
  • Self-Testing - The emergency power system must periodically test battery voltage and charger function, alerting building operators if the battery is degraded or the charger has failed

Emergency Power Technologies

Battery-Backed Inverter (UPS)

The most common approach in the UK. A high-capacity lead-acid or lithium battery is continuously charged from the mains supply. When mains power is lost, an inverter converts DC power to AC to power the control panel and all connected devices. Capacity is calculated from the total connected load of all smoke control devices - fans, actuators, control panel, and solenoids - and must provide sufficient autonomy for the full evacuation period declared in the fire safety strategy, typically a minimum of 60 minutes.

Emergency Generator

For larger buildings, a dedicated generator may be more cost-effective than batteries. The generator starts automatically when mains fails and supplies the smoke control panel (and other life-safety loads) within seconds. Generators are typically sized to run for several hours, powered by an on-site fuel tank.

Hybrid Systems

Some installations combine battery UPS for immediate power in the first few minutes with a standby generator for sustained power over subsequent hours.


Design Checklist for Specifiers

  1. Calculate total power consumption of all smoke control devices - fans, actuators, control panel, solenoids
  2. Determine the required autonomy period in line with building regulations and fire safety strategy
  3. Select a battery or generator system of appropriate capacity
  4. Design charging and monitoring circuitry to BS EN 12101-10
  5. Ensure emergency power supply is accessible for routine testing without affecting primary supply

Building control expects to see power calculations, specifications of the battery or generator system, and proof of capacity testing as part of commissioning documentation.


Relevant to All Other Parts

BS EN 12101-10 underpins the entire standard family - every system component depends on it:

  • BS EN 12101-2 - Electrically-activated AOV windows and roof vents
  • BS EN 12101-3 - Extract fans requiring emergency power to continue running
  • BS EN 12101-6 - Pressure differential system fans and controls
  • BS EN 12101-8 - Damper actuators requiring power to operate