BS EN 12101-1: Smoke and heat control systems. Specification for smoke barriers
BS EN 12101-1 specifies requirements for smoke barriers - horizontal and vertical barriers used to contain smoke within defined zones during a fire.
BS EN 12101-1 specifies the requirements for smoke barriers - fixed or deployable components designed to contain smoke within a defined zone and prevent it from spreading to adjacent areas during a fire. Smoke barriers work in conjunction with powered extract systems, natural ventilators, and pressure differential systems to form a complete smoke control strategy.
Part of the BS EN 12101 standard family.
What Are Smoke Barriers?
Smoke barriers are physical boundaries - typically constructed from rigid panels, flexible curtain materials, or glazed assemblies - that are installed at or below ceiling level to contain the smoke reservoir created during a fire. They are commonly used in:
- Atria and large open-plan spaces
- Shopping centres and retail malls
- Car parks and concourses
- Covered walkways and transport hubs
By containing smoke within a defined reservoir zone, barriers allow smoke control systems to extract smoke more efficiently and maintain a clear layer below the smoke level, protecting escape routes.
Key Requirements
Integrity Under Fire Conditions
Barriers must maintain their structural form and smoke containment performance when exposed to elevated temperatures. The standard specifies deflection limits and integrity criteria to prevent collapse or gap formation that would allow smoke to escape the reservoir zone.
Leakage Performance
Smoke barriers must limit air leakage around their perimeter and through any joints or fixings. Leakage is tested and classified under pressure differential conditions representative of real fire scenarios.
Deployable Barriers
Where barriers are designed to deploy on alarm activation (dropping from a ceiling recess, for example), the standard specifies:
- Activation time - the barrier must reach its deployed position within a defined period
- Reliability - endurance cycling tests to confirm consistent operation across the service life
- Fail-safe - barriers must deploy on power failure or signal loss
Fixing and Support
Barriers must be fixed to structure capable of supporting the loads imposed during both normal operation and fire conditions, including any dynamic loads during deployment.
Specification Checklist
When specifying smoke barriers under BS EN 12101-1, confirm:
- Barrier depth - the vertical dimension of the barrier below ceiling, defining the smoke reservoir depth
- Material - rigid (steel, glass) or flexible (fabric) construction
- Leakage classification - tested leakage rate under pressure differential
- Temperature rating - the temperature and duration the barrier maintains integrity
- Activation method - fixed, gravity-deploy, or motor-driven
- Fail-safe position - deployed (closed) on power loss
- CE marking and Declaration of Performance
Installation Requirements
- Fix to structural ceiling or soffit capable of supporting barrier loads
- Ensure no gaps between barrier edge and adjacent structure
- Wire deployable actuators to the smoke control panel
- Confirm deployment travel is unobstructed
- Label with function, classification, and activation method
- Commission and test full deployment cycle before handover
Related Standards
- BS EN 12101-2 - Natural ventilators that extract smoke from the reservoir
- BS EN 12101-3 - Powered fans for mechanical smoke extract
- BS EN 12101-6 - Pressure differential systems used alongside barriers