Skip to content

🔥O Range Smoke Control Panel - FSM Awards Shortlist: Fire Innovation of the Year!Discover More →

For warehouse and storage buildings

Smoke and heat venting for high-bay warehouses

High racking lets fire climb fast and fill a roof with smoke. We supply the SHEVs, barriers, inlets and controls that pull it out and keep escape routes usable.

SHEVsBarriersControls
Ventec natural smoke and heat exhaust ventilator

Before you specify

Seven questions you ask. Seven straight answers from us.

The questions contractors, M&E subcontractors and fire engineers put to us before specifying natural smoke ventilation for a warehouse or storage building.

You ask

Which standards cover a natural smoke and heat exhaust system in a warehouse?

Our answer

The roof ventilators are tested and marked to BS EN 12101-2. Reservoir sizing, vent free areas and inlet air follow BS 7346-4, with Approved Document B setting the fire safety objectives.

You ask

Can you supply the AOV roof vents, smoke curtains and controls as one package?

Our answer

YesWe stock natural AOV roof ventilators to BS EN 12101-2, smoke curtains that form the roof reservoirs, low-level inlet louvres and O Range control panels, so the whole SHEVS comes from one supplier.

You ask

Do we need low-level inlet air, and can you supply it?

Our answer

YesA natural SHEVS only exhausts smoke if replacement air enters at low level, so the design needs inlet free area matched to the roof vents, and we supply the inlet louvres and actuators to suit.

You ask

Our fire strategy uses the SHEVS as a compensatory feature for extended travel distances. Can you support that?

Our answer

YesWhen ventilation clears the roof reservoir to keep escape routes tenable, the vent areas and curtain drops have to match the fire engineer's figures, and we size the system to the BS 7346-4 design the strategy depends on.

You ask

How does the smoke ventilation coordinate with the sprinkler system?

Our answer

In sprinklered warehouses the reservoir depth and vent timing are set so ventilation works with the sprinklers rather than against them, often holding the vents until sprinkler activation. We build that cause-and-effect into the O Range panel to match the strategy.

You ask

What are your lead times for a high-bay job?

Our answer

Standard roof vents, inlet louvres, smoke curtains and control panels ship next day from over £1m of stock. Larger bespoke ventilator runs for high racking we confirm at the point of order.

You ask

Do you provide reservoir calculations and commissioning?

Our answer

YesOur team offers design support to size the smoke reservoirs, vent free areas and inlet air to BS 7346-4, then commissioning and ongoing maintenance once the system is installed.

Send us the fire strategy and roof layout and we will size the system and quote the full package.

The challenge

What warehouse smoke control has to handle

Big sheds carry more fire load than most buildings and far more open floor. Racking, height and open plans all push the smoke system harder. Here's what the design has to deal with.

Fast vertical fire spread

High-bay racking gives fire a ladder. It climbs the goods and grows quickly, dumping heat and smoke at roof level within minutes.

Large open floor plates

Open-plan layouts often use smoke control as a compensatory feature. Get the venting wrong and the compartment sizes fall apart.

Escape routes under smoke

Pickers and staff need tenable routes out. Smoke has to be held at high level while people clear the floor.

Firefighter access

Crews can't fight what they can't see. Exhausting heat and smoke keeps the building workable for the fire service.

Sprinkler coordination

Vents and sprinklers have to work together, not against each other. Timing and layout need agreeing early.

Stock and structure damage

Uncontrolled heat and smoke wreck goods and the building itself. Clearing it fast limits the loss.

The commercial point. Get the design right on paper, then the products have to match it on site.

The ventilation approach

How warehouse smoke systems are built

Most warehouses run a natural SHEV scheme. Smoke barriers split the roof into reservoirs, natural vents exhaust from high level, and low-level louvres bring in replacement air. Where a natural system can't move enough, mechanical extract takes over, all run off a control panel wired to detection.

BS 7346-4SHEV code of practice
BS EN 12101-2Natural vent standard
Ventec smoke and natural damper

Natural SHEVs and roof vents

Roof-mounted AOV vents exhaust smoke and heat from the reservoir, sized to BS 7346-4.

Smoke barriers and curtains

Fixed or drop barriers form roof-level reservoirs so smoke doesn't spread across the whole floor.

Inlet air louvres

Low-level louvres and doors bring in replacement air so the vents can actually clear the smoke.

Mechanical extract and controls

Extract fans where natural venting isn't viable, driven by O Range control panels and detection.

Best fit. Suits large single-storey warehouses, distribution sheds and high-bay storage under Approved Document B.

Who you are buying from

Since 1988. Stock on the shelf. Engineers on the phone.

1988Founded
100+People
£1m+Stock holding
Next dayDespatch
SCA memberNICEIC approvedSDI 19 certifiedConstructionlineBS EN 12101
FSM Awards 2026 Fire Innovation of the Year shortlist

Next step

Talk to the smoke ventilation team

Send us the layout, roof detail and compartment sizes and we'll spec the SHEVs, barriers, inlets and controls to match the design. Trade pricing, UK stock.