
- BS EN 12101-10
- 1-60 Zones
- Networked
- Smart Secure Verified
Leeds Smoke Ventilation
Smoke ventilation for the South Bank and Holbeck Urban Village tower pipeline, the large PBSA estate around Headingley and Hyde Park, and West Yorkshire housing association refurbishments. Next-day UK stock despatch and SDI 19 certified commissioning: supplying the trade since 1988.


AOV roof vents, smoke dampers, control panels, actuators and fans - all in stock for next-day delivery to Leeds.
Β£1M+ UK stock. Next-day delivery across Leeds.



Β£1M+ UK stock. Next-day delivery.
No middlemen. No long lead times.
Real engineers who know the product.

Trade supply of multi-zone AOV systems, smoke shaft dampers and addressable control panels for Leeds South Bank and Holbeck Urban Village towers, plus stairwell AOV kits sized for corridor-access PBSA blocks around Headingley and Hyde Park. UK stock for next-day delivery across West Yorkshire.
Professional installation of complete smoke ventilation systems - stairwell AOVs, smoke shaft systems, mechanical extract, and car park ventilation. Directly employed engineers, no sub-contracting.
SDI 19 certified commissioning of new and existing systems. Zone-by-zone functional testing, cause-and-effect verification, fire alarm integration, and full documentation for building control sign-off.
Smoke ventilation upgrades to West Yorkshire's post-war high-rise stock: obsolete panels, worn actuators and non-compliant AOV windows replaced for local authorities and housing associations to meet Building Safety Act 2022 obligations.
Over 38 years supplying and commissioning smoke ventilation systems across the UK.
Every engineer holds SDI 19 certification for smoke ventilation competency.
Stocked items despatched same day for next-day delivery across Leeds and West Yorkshire: Bradford, Wakefield, Huddersfield and Halifax on the same run.
All products and installations certified to the relevant sections of BS EN 12101.
Leeds city centre has seen a sustained wave of tall residential development along the south bank of the River Aire and through Holbeck Urban Village. Purpose-built towers and converted warehouse blocks in this area require multi-zone smoke ventilation systems with addressable control panels, smoke shaft dampers, and stairwell AOVs that operate reliably under all conditions. Many of these schemes also include basement car parks requiring mechanical extract ventilation to BS 7346-7.
Student accommodation is a significant part of Leedsβ building stock, with large purpose-built blocks concentrated around the universities and extending into Headingley and Hyde Park. These buildings present particular fire safety challenges due to high occupancy densities and corridor-access layouts, making properly commissioned smoke ventilation systems essential. Vent Trade supplies and commissions systems for student housing developers and operators across the city, ensuring each installation meets Approved Document B and university fire safety requirements.
Across wider West Yorkshire, housing associations and local authorities manage substantial portfolios of post-war high-rise residential blocks. Many require full smoke ventilation refurbishments - replacing obsolete panels, worn actuators, and non-compliant AOV windows - to meet the requirements of the Building Safety Act 2022.
All work is carried out in accordance with BS EN 12101, BS 7346, Approved Document B, and the Building Safety Act 2022. For high-rise residential buildings above 18 metres, we provide the detailed commissioning and handover records required for the golden thread of building safety information.
Active Smoke Control Association members. We sit on and head numerous SCA committees.
Dedicated commissioning engineers and installers based across the UK with strong Leeds and West Yorkshire coverage.
Constructionline Gold accredited for verified supply chain compliance and capability.
Speak to our team for product supply, installation, commissioning, or maintenance.