Skip to content

πŸ”₯O Range Smoke Control Panel - FSM Awards Shortlist: Fire Innovation of the Year!Discover More β†’

Bristol Smoke Ventilation

THE Smoke Ventilation Bristol

Smoke ventilation for the Temple Quarter and Bristol Temple Meads regeneration zone, Harbourside dockside conversions and the new mid- and high-rise stock rising across Bedminster and south Bristol. Next-day despatch from UK stock and SDI 19 certified commissioning: trade specialists since 1988.

Products We Supply into Bristol

Smoke Ventilation Products

AOV roof vents, smoke dampers, control panels, actuators and fans - all in stock for next-day delivery to Bristol.

Β£1M+ UK stock. Next-day delivery across Bristol.

Need Products?
  • AOV Roof Vents & Louvres
  • Smoke Control Dampers
  • Smoke Control Panels
  • Window Actuators & Fans
Think Why

Β£1M+ UK stock. Next-day delivery.

No middlemen. No long lead times.

Real engineers who know the product.

Think Vent
  • 38+ years trade experience
  • 24hr UK delivery
  • 24/7 O Range tech support
  • BS EN 12101 compliant

What We Do in Bristol

Product Supply

Trade supply of AOV windows, dampers, actuators and addressable panels for Temple Quarter and Harbourside residential towers and Bedminster regeneration mid- and high-rise schemes. UK stock for next-day delivery across the South West.

Installation

Professional installation of complete smoke ventilation systems - stairwell AOVs, smoke shaft systems, mechanical extract, and car park ventilation. Directly employed engineers, no sub-contracting.

Commissioning

SDI 19 certified commissioning of new and existing systems. Zone-by-zone functional testing, cause-and-effect verification, fire alarm integration, and full documentation for building control sign-off.

Refurbishment

Smoke ventilation upgrades to Broadmead and Bristol city centre commercial and residential blocks where panels, actuators and AOV windows pre-date current standards. Full replacement programmes for property managers and South West housing associations under the Building Safety Act 2022.

Since 1988

Industry Experience

Over 38 years supplying and commissioning smoke ventilation systems across the UK.

SDI 19

Certified Engineers

Every engineer holds SDI 19 certification for smoke ventilation competency.

Next Day

Product Despatch

Stocked items despatched same day for next-day delivery across Bristol, Bath and the South West via the M4 and M5.

BS EN 12101

Full Compliance

All products and installations certified to the relevant sections of BS EN 12101.

Smoke Ventilation Services Across Bristol

Bristol’s development pipeline is concentrated around several key growth areas. Temple Quarter, centred on the redevelopment around Bristol Temple Meads station, is delivering major mixed-use schemes with residential towers that require multi-zone smoke ventilation systems from design stage through to commissioning. The Harbourside continues to see new apartment blocks and conversions of former dockside buildings, many with complex internal layouts that demand carefully designed smoke clearance strategies for protected corridors and stairwells.

Bedminster and south Bristol are undergoing significant regeneration, with new-build residential developments replacing former industrial land. These mid-rise and high-rise schemes need complete smoke ventilation installations - stairwell AOVs, smoke shaft dampers, mechanical extract for car parks, and addressable control panels. Vent Trade supplies product to contractors working across south Bristol and provides SDI 19 certified commissioning to ensure each system is handed over with full documentation for building control sign-off.

In the Broadmead and city centre area, older commercial and residential buildings are being refurbished and repurposed. Many of these properties have smoke ventilation systems that pre-date current standards, with panels, actuators, and AOV windows that require replacement. Vent Trade works with Bristol property managers and housing associations to deliver systematic refurbishments that bring these buildings into compliance with BS EN 12101 and the Building Safety Act 2022.

Compliance Standards

All work is carried out in accordance with BS EN 12101, BS 7346, Approved Document B, and the Building Safety Act 2022. For high-rise residential buildings above 18 metres, we provide the detailed commissioning and handover records required for the golden thread of building safety information.

Why Choose Vent Trade

SCA

Member

Active Smoke Control Association members. We sit on and head numerous SCA committees.

100+

Employees

Dedicated commissioning engineers and installers based across the UK with strong Bristol and South West coverage.

Constructionline

Gold

Constructionline Gold accredited for verified supply chain compliance and capability.

Need Smoke Ventilation in Bristol?

Speak to our team for product supply, installation, commissioning, or maintenance.